Industrial Park No. 5 Road Improvements
Location: Grant County, WA
Dates: Oct. 2017 – Nov. 2017
Description:
1,400 LF of roadway including excavation, grading, subgrade preparation, gravel borrow, crushed surfacing aggregate courses, hot mix asphalt pavement, driveway entrances, permanent signing, pavement marking, miscellaneous surface restoration, traffic control, and illumination system.
Other Land Development/Roads & Infrastructure Projects:
Location: Kennewick, WA
Description:
The Port of Kennewick and Total Site Services broke ground on a $4.9 million infrastructure project that will set the stage to redevelop Vista Field, the 103-acre former municipal airport in the heart of Kennewick.
Location: Joint Base Lewis McChord
Client: US Army Corps of Engineers
Project Description: A design-build project providing the first phase of linkage between the Lewis and McChord sites of JBLM after becoming a joint base in 2010. The project involved horizontal and vertical construction with roadways, a roundabout and a bridge over the BNSF Railroad and the publicly accessible 150th Street/Perimeter Road to connect Lewis Main and McChord Field. The Access Control Point included guard booths, private vehicle inspection areas, access control canopy, road lane control, security lighting, and fencing. Support facilities included utilities, paving, storm drainage, telecommunication systems, and site improvements. Heating was provided by electric space and infrared heating. Sustainable design practices were achieved through storm water management and LED lighting. Received the Society of American Military Engineers’ (SAME) Projects of Excellence Silver Award.
Location: Chief Joseph Dam, WA
Client: US Army Corps of Engineers
Project Description: Installation of a storm drainage system, re-grading of a seven (7) acre site, demolish large concrete stop logs and provide a new metal equipment storage building for the Corps of Engineers at Chief Joseph Dam, WA.
Location: Richland, WA
Description: Resurfacing and paving of a 119,000sf parking lot including signage, striping, wheel stops, and ADA ramps.
Location: Kennewick, WA
Description: Improvements for the 25 acre Hansen Park including 4,210LF of asphalt pathway, parking lot, water lines, sewer service, and community gardens.
Location: Richland, WA
Description: Extension of the 15kV utility distribution system around Snyder Substation Facility and along Hagen Road.