CHEMICAL BATTALION COMPLEX PN64014 – COMPANY OPERATION FACILITY (COF)
Client: US Army Corps of Engineers
Project Description: Design-Bid-Build of a 45,222 SF Company Operations Facility (COF) that is designed to house four companies totaling 500 personnel, with a 6,984 SF detached adjacent covered concrete hardstand. Site work includes a drive aisle in back to serve the covered hardstand, utilities, and typical landscaped areas around the facility. As a LEED Silver facility, the COF was designed to achieve a 30% energy savings over current ASHRAE standards and includes high efficiency HVAC, plumbing and electrical components throughout the facility. The buildings and site are also in compliance with anti-terrorism standards and are configured to meet or exceed these requirements.
Contract Value: $9.1M