Chemical Battalion Complex PN64014 – Company Operation Facility (COF)

Lower Granite Dam Fish Barge Moorage
April 3, 2019
EPC-2 Build Out
April 3, 2019
EPC-2 Build Out
April 3, 2019
Lower Granite Dam Fish Barge Moorage
April 3, 2019

CHEMICAL BATTALION COMPLEX PN64014 – COMPANY OPERATION FACILITY (COF)

Client:  US Army Corps of Engineers

Project Description:  Design-Bid-Build of a 45,222 SF Company Operations Facility (COF) that is designed to house four companies totaling 500 personnel, with a 6,984 SF detached adjacent covered concrete hardstand. Site work includes a drive aisle in back to serve the covered hardstand, utilities, and typical landscaped areas around the facility.  As a LEED Silver facility, the COF was designed to achieve a 30% energy savings over current ASHRAE standards and includes high efficiency HVAC, plumbing and electrical components throughout the facility. The buildings and site are also in compliance with anti-terrorism standards and are configured to meet or exceed these requirements.

Contract Value:  $9.1M